Readings Newsletter
Become a Readings Member to make your shopping experience even easier.
Sign in or sign up for free!
You’re not far away from qualifying for FREE standard shipping within Australia
You’ve qualified for FREE standard shipping within Australia
The cart is loading…
The story of the Messerschmitt Me 109’s ultimate development, the Blohm & Voss BV 155, begins in 1942 with plans to split the Me 109 family into three branches - a standard fighter, a high-altitude fighter and a carrier-based fighter. Initially these were known as the Me 409 but later became the Me 155 A, B and C. The project was given to the French to develop, where it stalled. But when Germany got its first taste of what the USAAF’s bomber force was capable of - suffering huge damage to its war-critical industries as a result of massed raids on its factories and cities - work on the Me 155 B was recommenced as a matter of urgency. With the Me 262 consuming most of Messerschmitt’s design capacity, the project was then passed on to a sub-contractor: Blohm & Voss. Richard Vogt, B&V’s chief designer, quickly realised that Messerschmitt had made very little progress on the design and was forced to begin again almost from scratch. In just over a year, a prototype was built and flown - but the war ended before production could begin.
$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout
The story of the Messerschmitt Me 109’s ultimate development, the Blohm & Voss BV 155, begins in 1942 with plans to split the Me 109 family into three branches - a standard fighter, a high-altitude fighter and a carrier-based fighter. Initially these were known as the Me 409 but later became the Me 155 A, B and C. The project was given to the French to develop, where it stalled. But when Germany got its first taste of what the USAAF’s bomber force was capable of - suffering huge damage to its war-critical industries as a result of massed raids on its factories and cities - work on the Me 155 B was recommenced as a matter of urgency. With the Me 262 consuming most of Messerschmitt’s design capacity, the project was then passed on to a sub-contractor: Blohm & Voss. Richard Vogt, B&V’s chief designer, quickly realised that Messerschmitt had made very little progress on the design and was forced to begin again almost from scratch. In just over a year, a prototype was built and flown - but the war ended before production could begin.