Readings Newsletter
Become a Readings Member to make your shopping experience even easier.
Sign in or sign up for free!
You’re not far away from qualifying for FREE standard shipping within Australia
You’ve qualified for FREE standard shipping within Australia
The cart is loading…
Shortly after the International Smelter offered economic salvation to Tooele’s struggling desert community, the Tooele Valley Railroad became the town artery. Though originally built in 1908 to connect the smelter to the Union Pacific and Western Pacific lines west of town, the railroad became central to daily life. Hundreds of local workers rode it to and from work each day. As technology continued to change Tooele, the Tooele Valley Railroad shared Vine Street with the first automobiles–safety precautions required that the caboose, with a horn mounted to warn motorists, lead the oncoming train. However, the smelter’s decades of prosperity proved short-lived, and by the 1930s, the town had fallen on difficult times once again. The railroad outlived the smelter, but operations ceased in the early 1980s, and the city had the abandoned tracks removed.
$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout
Shortly after the International Smelter offered economic salvation to Tooele’s struggling desert community, the Tooele Valley Railroad became the town artery. Though originally built in 1908 to connect the smelter to the Union Pacific and Western Pacific lines west of town, the railroad became central to daily life. Hundreds of local workers rode it to and from work each day. As technology continued to change Tooele, the Tooele Valley Railroad shared Vine Street with the first automobiles–safety precautions required that the caboose, with a horn mounted to warn motorists, lead the oncoming train. However, the smelter’s decades of prosperity proved short-lived, and by the 1930s, the town had fallen on difficult times once again. The railroad outlived the smelter, but operations ceased in the early 1980s, and the city had the abandoned tracks removed.