Become a Readings Member to make your shopping experience even easier. Sign in or sign up for free!

Become a Readings Member. Sign in or sign up for free!

Hello Readings Member! Go to the member centre to view your orders, change your details, or view your lists, or sign out.

Hello Readings Member! Go to the member centre or sign out.

Bridge Safety
Paperback

Bridge Safety

$57.99
Sign in or become a Readings Member to add this title to your wishlist.

In response to a congressional request, GAO reviewed the Zilwaukee Bridge Project to: (1) determine whether the testing program that the Michigan Department of Transportation (MDOT) implemented confirmed that the bridge was structurally sound; (2) identify construction problems causing concerns about the bridge and determine whether they would affect its ability to perform as designed; and (3) assess the MDOT draft bridge maintenance manual. GAO found that: (1) the tests indicated that the Zilwaukee Bridge had performed as designed and that the concrete exceeded design requirements for strength and durability; (2) repairs made after a 1982 construction accident fully restored the damaged areas of the bridge; (3) concrete spalling and cracking did not affect the bridge’s ability to perform as designed; (4) MDOT took corrective action to ensure proper bonding of all areas with a concrete overlay; and (5) although an independent panel’s review of the maintenance manual concluded that the manual was generally well prepared, it recommended several changes that, if followed, would provide for more adequate future maintenance.

Read More
In Shop
Out of stock
Shipping & Delivery

$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout

MORE INFO
Format
Paperback
Publisher
Bibliogov
Country
United States
Date
27 June 2013
Pages
62
ISBN
9781289040574

In response to a congressional request, GAO reviewed the Zilwaukee Bridge Project to: (1) determine whether the testing program that the Michigan Department of Transportation (MDOT) implemented confirmed that the bridge was structurally sound; (2) identify construction problems causing concerns about the bridge and determine whether they would affect its ability to perform as designed; and (3) assess the MDOT draft bridge maintenance manual. GAO found that: (1) the tests indicated that the Zilwaukee Bridge had performed as designed and that the concrete exceeded design requirements for strength and durability; (2) repairs made after a 1982 construction accident fully restored the damaged areas of the bridge; (3) concrete spalling and cracking did not affect the bridge’s ability to perform as designed; (4) MDOT took corrective action to ensure proper bonding of all areas with a concrete overlay; and (5) although an independent panel’s review of the maintenance manual concluded that the manual was generally well prepared, it recommended several changes that, if followed, would provide for more adequate future maintenance.

Read More
Format
Paperback
Publisher
Bibliogov
Country
United States
Date
27 June 2013
Pages
62
ISBN
9781289040574