Readings Newsletter
Become a Readings Member to make your shopping experience even easier.
Sign in or sign up for free!
You’re not far away from qualifying for FREE standard shipping within Australia
You’ve qualified for FREE standard shipping within Australia
The cart is loading…
Practical Construction Planning and Control Using Microsoft Project fills a clear gap in the teaching literature by specifically demonstrating the Critical Path Method (CPM) using Microsoft Project (MSP).
This new textbook provides a brief description of CPM phases and explains and illustrates the particular MSP commands and functionalities that implement them using an example construction project which is consistent throughout every chapter of the book. Each CPM phase is explained along with the relevant MSP commands coupled with explanations and illustrations that describe the implementation. The chapters provide detailed descriptions and steps for the generation of common construction scheduling deliverables, such as Gantt chart schedules and cash flow reports.
Following an Introduction that lays out the essential concepts, the thirteen chapters cover planning, scheduling, resources and costs, project updating for time and cost, project progress measurement using earned value analysis and project reports.
By successfully combining the details of CPM as a management technique with illustrated guidance on the software, the book presents a hands-on self-study guide for learning CPM and MSP and is an ideal teaching tool for use on Construction Management, Construction Engineering and Project Management degree programs and for Professionals who are looking to learn construction project scheduling using widely available Microsoft Project software.
$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout
Practical Construction Planning and Control Using Microsoft Project fills a clear gap in the teaching literature by specifically demonstrating the Critical Path Method (CPM) using Microsoft Project (MSP).
This new textbook provides a brief description of CPM phases and explains and illustrates the particular MSP commands and functionalities that implement them using an example construction project which is consistent throughout every chapter of the book. Each CPM phase is explained along with the relevant MSP commands coupled with explanations and illustrations that describe the implementation. The chapters provide detailed descriptions and steps for the generation of common construction scheduling deliverables, such as Gantt chart schedules and cash flow reports.
Following an Introduction that lays out the essential concepts, the thirteen chapters cover planning, scheduling, resources and costs, project updating for time and cost, project progress measurement using earned value analysis and project reports.
By successfully combining the details of CPM as a management technique with illustrated guidance on the software, the book presents a hands-on self-study guide for learning CPM and MSP and is an ideal teaching tool for use on Construction Management, Construction Engineering and Project Management degree programs and for Professionals who are looking to learn construction project scheduling using widely available Microsoft Project software.