Challenger 2
Dick Taylor
Challenger 2
Dick Taylor
The introduction into British army service of the Challenger2 Main Battle Tank (MBT) was originally intended to take a mere eighteen months from design to production, but in the event, it took something closer to ten years. Why this was so is an important part of the Challenger 2 story, and although on the face of it this might seem to be a clear failure, it actually produced the most thoroughly tested and reliable tank ever to enter service with the Royal Armoured Corps (RAC). The tank has now been in service for twenty years and can be expected to form part of the British army’s inventory
albeit in low numbers
until around 2035, which would make it the longestserving frontline battle tank ever used by the UK.
198 colour photographs, colour profiles, gloss paper
This item is not currently in-stock. It can be ordered online and is expected to ship in approx 4 weeks
Our stock data is updated periodically, and availability may change throughout the day for in-demand items. Please call the relevant shop for the most current stock information. Prices are subject to change without notice.
Sign in or become a Readings Member to add this title to a wishlist.