Frontiers in Statistical Quality Control 8

Frontiers in Statistical Quality Control 8
Format
Paperback
Publisher
Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
Country
Germany
Published
13 March 2006
Pages
351
ISBN
9783790816860

Frontiers in Statistical Quality Control 8

This title is printed to order. This book may have been self-published. If so, we cannot guarantee the quality of the content. In the main most books will have gone through the editing process however some may not. We therefore suggest that you be aware of this before ordering this book. If in doubt check either the author or publisher’s details as we are unable to accept any returns unless they are faulty. Please contact us if you have any questions.

In Canada, acceptance sampling has been used in legal metrology applications for nearly four decades. One of its principal uses has been in the quality control of utility meters that measure electricity or natural gas supplied to consumers. By law, such meters must be inspected for conformance to specification requirements prior to use and be periodically inspected while huse. With few exceptions, due to the numerous utility companies in the country and their varied practices, the meters exist in the form of isolated lots for inspection purposes. The proportion of nonconforming meters in a lot has traditionally defined lot quality for utility meter sampling inspection purposes. Another principal application of acceptance sampling has been in the quality control of the net contents of packaged products sold in the marketplace. Such products include those sold on the basis of such measures as weight, volume, length, and area. In this particular application, products are also usually inspected on an isolated-lot basis for regulatory purposes. However, lot quality is usually measured on the basis of two criteria for such products: the proportion of nonc- forming packages in the lot and the lot mean quantity. This section reviews Canadian quality control practices in these two areas of application, highlighting some of the deficiencies and issues. Three-class s- pling plans are proposed as a possible solution to some of these deficiencies and issues.

This item is not currently in-stock. It can be ordered online and is expected to ship in 7-14 days

Our stock data is updated periodically, and availability may change throughout the day for in-demand items. Please call the relevant shop for the most current stock information. Prices are subject to change without notice.

Sign in or become a Readings Member to add this title to a wishlist.