Integrated Materials Handling in Manufacturing

Willi Muller

Integrated Materials Handling in Manufacturing
Format
Paperback
Publisher
Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
Country
Germany
Published
23 August 2014
Pages
121
ISBN
9783662120941

Integrated Materials Handling in Manufacturing

Willi Muller

This title is printed to order. This book may have been self-published. If so, we cannot guarantee the quality of the content. In the main most books will have gone through the editing process however some may not. We therefore suggest that you be aware of this before ordering this book. If in doubt check either the author or publisher’s details as we are unable to accept any returns unless they are faulty. Please contact us if you have any questions.

ANUFACTURING in mechanical engineering enterprises is M characterised by fundamental changes both inside and outside the l11 organisation . Inside the organisation, account must be taken of increasing cost pressures in wages, materials, energy and stocks, all of which necessitate making the most effective use possible of manufacturing capacity. Outside the organisation, changes in consumer demand take place. These stem from increasing domestic and foreign competition which result in an increase in the volume of deliveries, a proliferation of products and a related shortening of product life-cycles. These give rise to wider component ranges involving smaller quantities which, because of increasingly necessary changes in materials and despite higher stocks, still lead to longer throughput times. These trends impose a continuous pressure on businesses to take steps to rationalise both organisational and technical procedures. When considering the introduction of new technology and raw materials or the re-organisation of labour-intensive manufacturing plants, considerable weight has been given up to now to the automation of production processes. As shown in Fig. 1, which is an analysis of working hours of manufacturing units, successful rationalisation has been achieved already in this way; this has brought a relatively high and cost-effective utilisation of the manufacturing facilities related to the l21 planned operating time .

This item is not currently in-stock. It can be ordered online and is expected to ship in 7-14 days

Our stock data is updated periodically, and availability may change throughout the day for in-demand items. Please call the relevant shop for the most current stock information. Prices are subject to change without notice.

Sign in or become a Readings Member to add this title to a wishlist.