Practice Standard for Work Breakdown Structures

Project Management Institute

Practice Standard for Work Breakdown Structures
Format
Paperback
Publisher
Project Management Institute
Country
United States
Published
15 July 2019
Pages
100
ISBN
9781628256192

Practice Standard for Work Breakdown Structures

Project Management Institute

The Work Breakdown Structure (WBS) serves as a guide for defining work as it relates to a specific project’s objectives. The Practice Standard for Work Breakdown Structures Third Edition supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK ® Guide) Sixth Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.

This item is not currently in-stock. It can be ordered online and is expected to ship in approx 4 weeks

Our stock data is updated periodically, and availability may change throughout the day for in-demand items. Please call the relevant shop for the most current stock information. Prices are subject to change without notice.

Sign in or become a Readings Member to add this title to a wishlist.