A Comparative Analysis of the Cost Estimating Error Risk Associated with Flyaway Costs Versus Individual Components of Aircraft

Jonathan D Ritschel

A Comparative Analysis of the Cost Estimating Error Risk Associated with Flyaway Costs Versus Individual Components of Aircraft
Format
Paperback
Publisher
Biblioscholar
Country
Published
11 October 2012
Pages
136
ISBN
9781249624455

A Comparative Analysis of the Cost Estimating Error Risk Associated with Flyaway Costs Versus Individual Components of Aircraft

Jonathan D Ritschel

This title is printed to order. This book may have been self-published. If so, we cannot guarantee the quality of the content. In the main most books will have gone through the editing process however some may not. We therefore suggest that you be aware of this before ordering this book. If in doubt check either the author or publisher’s details as we are unable to accept any returns unless they are faulty. Please contact us if you have any questions.

A shrinking workforce, unstable budgets, and rapidly changing objectives under stricter time constraints characterize today’s cost analysis and acquisition environment. In concert with this environment, cost analyst positions have rapidly decreased as demonstrated by Aeronautical Systems Centers 54% decline in total authorized slots from 1992 to 2001. The question is how to deal with this ‘more with less’ mentality.The purpose of this research is to investigate and measure the risks associated with taking a macro versus micro approach to aircraft cost estimation. By analyzing the fidelity of a cost estimate developed at the flyaway cost level versus a cost estimate developed at the individual components level, this research provides guidelines for appropriate allocation of cost analyst resources. This objective is accomplished by looking at the cost estimation error risk of recurring costs at level one of the Work Breakdown Structure (WBS) and at level two of the WBS.Results show that there is a statistically significant difference between estimating at the differing WBS levels. However, from a practical standpoint, the difference in dollar terms is too small to be considered significant. As a result, program manager should allocate resources based on other constraints such as time allotted to complete the estimate or required level of visibility into the estimate.

This item is not currently in-stock. It can be ordered online and is expected to ship in 7-14 days

Our stock data is updated periodically, and availability may change throughout the day for in-demand items. Please call the relevant shop for the most current stock information. Prices are subject to change without notice.

Sign in or become a Readings Member to add this title to a wishlist.