The importance of the structures of the construction market for the implementation of the BIM method in an international comparison

Esra Korff

Format
Paperback
Publisher
Grin Verlag
Published
2 September 2019
Pages
216
ISBN
9783668987357

The importance of the structures of the construction market for the implementation of the BIM method in an international comparison

Esra Korff

Master's Thesis from the year 2019 in the subject Engineering - Civil Engineering, Technical University of Braunschweig (Institut fuer Bauwirtschaft und Baubetrieb), language: English, abstract: "Why is Germany behind the UK, US and Finland in BIM and how can Germany catch up again?" Over the years of the rise of BIM, numerous scientific papers have been written in various countries about structural barriers to BIM. Sometimes about structural barriers that exist in certain countries, like Becerik-Gerber / Rice's (2010) "The perceived value of building Information Modeling in the U.S. Building Industry", structural barriers that exist in certain areas, like Jeong et al.'s (2015) "BIM acceptance model in construction organisations", or general investigations in structural barriers to BIM, like Azahr et al.'s (2017) "Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challenges". Scientific papers about structural barriers to BIM in Germany are, however, still rare and mostly in form of statistics, such as Braun et al. (2015). To conduct a comprehensive search for structural barriers to BIM and corresponding solutions in Germany, an individual approach is hence chosen. In a broad international literature review, potential structural barriers to BIM are identified from different sources, such as the ones named above. On the basis of such possible barriers to BIM, a comparison of Germany with the BIM leading countries, UK, US and Finland is conducted. This shall reveal what structural barriers are in effect in Germany that are non-existent or already overcome in the other countries, to derive corresponding suggestions for Germany. Where a differentiation between market participants is necessary in this work, the focus is put on contractors. To conduct this research, the course of this work is chosen as the following. It starts in the second chapter with a roundup about BIM and its potential, to provide a common inf

This item is not currently in-stock. It can be ordered online and is expected to ship in approx 2 weeks

Our stock data is updated periodically, and availability may change throughout the day for in-demand items. Please call the relevant shop for the most current stock information. Prices are subject to change without notice.

Sign in or become a Readings Member to add this title to a wishlist.