Readings Newsletter
Become a Readings Member to make your shopping experience even easier.
Sign in or sign up for free!
You’re not far away from qualifying for FREE standard shipping within Australia
You’ve qualified for FREE standard shipping within Australia
The cart is loading…
Forethoughts
Introduction
A n ote on nomenclature 1 Maintenance 2 Entry into confined spaces 3 Changes to processes and plants 4 Changes in organization 5 Changing procedures instea d of designs 6 Materials of construction (including insulat ion) and corrosion 7 Operating methods 8 Explo sions 9 Poor communication 10 I didn’t know th at… 11 Control 12 Leaks 13 Reac tions - planned and unplanned 14 Both design and operations could have been better 15 Accidents in other industries 16 Accident investigation - Missed opportunities
Afterthoughts realities of plant operations.‘ (IChemE-Institute of Chemical Engineers)
$9.00 standard shipping within Australia
FREE standard shipping within Australia for orders over $100.00
Express & International shipping calculated at checkout
Forethoughts
Introduction
A n ote on nomenclature 1 Maintenance 2 Entry into confined spaces 3 Changes to processes and plants 4 Changes in organization 5 Changing procedures instea d of designs 6 Materials of construction (including insulat ion) and corrosion 7 Operating methods 8 Explo sions 9 Poor communication 10 I didn’t know th at… 11 Control 12 Leaks 13 Reac tions - planned and unplanned 14 Both design and operations could have been better 15 Accidents in other industries 16 Accident investigation - Missed opportunities
Afterthoughts realities of plant operations.‘ (IChemE-Institute of Chemical Engineers)